Have you received several quotes for your renovation, but the amounts vary widely? Before choosing the cheapest, check that the companies are actually offering the same work. One quote may include surface preparation, protective coverings and waste removal; another may leave you to cover these items.

A good comparison focuses on the expected result, the services included, the materials, the total cost including VAT and the conditions for carrying out the work. Here is a method to help you understand the differences and get precise answers before committing to work in Belgium.

1. Send the same request to each company

Comparison starts before you receive the quotes. Prepare a shared brief: rooms concerned, available dimensions, visible condition, desired result, standard of finish and access constraints. Send the same photos and plans to each company.

Distinguish between essentials and items that can be offered as options. For a bathroom, for example, specify whether you want to keep the water supply points, replace the wall covering, install ventilation or alter the electrics. “Renovate the bathroom” leaves too much room for interpretation.

  • List the materials and fittings you want to choose yourself.
  • Specify whether the home will remain occupied during the work.
  • Specify the floors, lift, parking and access hours.
  • Ask for a site visit when the condition of the property affects the pricing.
  • Share important answers with all the companies you have approached.

For a large project, requesting three quotes can be a practical starting point. Homegrade recommends requesting several quotes for the same work and also comparing methods and materials. However, the number of quotes is no substitute for their quality.

2. Check who is issuing the quote and what it represents

Check the company’s identity, address and enterprise number in CBE Public Search. The name on the quote must make it clear who you are contracting with. Registration with the CBE alone does not guarantee a provider’s quality or solvency.

Ask whether the person you meet carries out the work themselves, manages a team or plans to use subcontractors. For work involving several trades, identify your point of contact and how responsibilities are divided.

According to ConsumerConnect, the FPS Economy service, the contractor must provide a quote if you request one and they are willing to provide the service, with an exception for certain standard services. Preparing the quote may incur a charge, but the fees must be clearly stated in advance. Ask about the terms before any assessment or visit for which a fee is charged.

Do not sign several quotes simply to reserve them. An accepted quote may constitute a contract. Read the terms and conditions and have important clarifications incorporated before you agree.

3. Compare the scope: included, excluded or to be clarified

Go through each phase of the work and assign it a status in each quote: included with a price, excluded, offered as an option or unspecified. A blank box means “missing information”, not “free”.

Item to checkQuestion to ask
Site setup and protectionIs protection for floors, furniture, stairs and communal areas included?
Removal and demolitionWhich elements will be removed, and down to which underlying surface?
PreparationIs levelling, repair, drying or treatment of the underlying surface included?
Materials and fittingsAre the brand, model, quantity and accessories identified?
InstallationAre fixings, connections, joints and adjustments included?
FinishingAre painting, touch-ups, skirting boards and making good after the work included?
Access and wasteAre scaffolding, an external goods lift, a skip, transport and waste removal included?
ChecksHave tests, technical acceptance checks and required certificates been priced?
Completion of workAre cleaning, removal of protective coverings and handover of documents included?

This table is a checklist of questions to adapt: not every item applies to every project. For electrical work, making good a wall may be handled by another trade. The key is to know this and include it in the budget.

4. Check quantities and materials

Two prices per square metre are only comparable if they cover an area measured in the same way and equivalent work. Ask how openings, cuts, wastage and small areas are handled.

A difference in quantity may be an error, but it may also reflect a different method. Ask for an explanation before changing a figure yourself. For items where the quantity will only be known after opening up a wall or removing a covering, ask how the final measurement will be determined.

For materials and fittings, look for a verifiable reference:

  • Insulation: product, thickness, thermal performance and installation method.
  • Window frames: dimensions, profiles, glazing, performance and finishes around the joints.
  • Surface covering: product reference or materials budget, preparation and installation accessories.
  • Heating: model, sizing, controls, connections and commissioning.
  • Painting: surface preparation, product, areas and planned finishing system.

The wording “or equivalent” warrants an explanation: what criteria define equivalence, and how should a replacement be approved? Ask for technical data sheets when the choice affects performance or maintenance. For a complex system, have a suitably qualified professional assess the compatibility of the components.

5. Understand how the price may change

The calculation method is just as important as the total shown. Ask the company to explain the method it uses and the assumptions behind its quote.

Pricing methodWhat to clarify
Fixed priceWork covered, exclusions, qualifications and any price revision clause
Unit pricesPrice per unit, estimated quantities and procedure for final measurement
Time and materialsHourly rates, number of people, materials, travel and tracking of hours
Provisional sumWhat it covers and how the actual amount is calculated
Option or alternativeOptional status, technical difference and cost if you choose it

A fixed price must be read with its limitations in mind: a change you request or an unforeseen situation may require a contractual discussion. Conversely, an estimated amount is not a controlled budget if nothing specifies how it will be monitored.

For work charged on a time-and-materials basis, request regular statements and agree on an alert threshold before the planned budget is exceeded. Have it clarified whether travel, purchases, rentals and preparation time are charged separately.

6. Compare amounts using the correct VAT

Compare prices excluding VAT, then the VAT for each item, and finally the total payable. A quote at 6% may appear more attractive than one at 21% without the difference coming from the cost of the work.

The FPS Finance states that a 6% rate may apply to certain renovations of a home that is at least ten years old, subject to other conditions relating in particular to the nature of the work, private use and invoicing. The building’s age alone does not make the entire quote eligible.

If you buy the building materials yourself, their purchase is subject to 21% VAT. Materials supplied and installed by the contractor may qualify for the reduced rate when the conditions are met. Ask for a comparison of the full cost before deciding to buy the supplies separately.

Be careful with heating: specific components of a system powered by fossil fuels, including a gas or oil-fired boiler and its installation, are subject to the standard 21% rate under the rules described by FPS Finance for renovation work since 29 July 2025. Other components, such as certain radiators, may remain eligible for 6% if the conditions are met. Have the items broken down rather than applying a single rate for convenience.

7. Example: the initially cheaper quote becomes more expensive

Fictitious illustration, not indicative of market rates: two companies offer work with materials and performance assumed to be identical. For this example only, all items meet the conditions for the 6% VAT rate.

ItemQuote AQuote B
Initial price excluding VAT10 000 €11 500 €
Initial price including VAT10 600 €12 190 €
Necessary removal, disposal and finishing workExcluded: assumed additional cost of €1,800 excluding VATIncluded
Comparable total excluding VAT11 800 €11 500 €
Comparable total including VAT12 508 €12 190 €

After adding the same work, B costs €318 less than A. In a real project, do not replace an exclusion with your own estimate: ask the company for a written supplementary quote. If the price of an essential item remains unknown, the comparable total has not yet been established.

This calculation does not settle everything. Timescales, workmanship, payment terms and references still need to be examined.

8. Compare the schedule and payment terms

Ask for a start date or period, a completion timeframe and the conditions they depend on: permits, delivery, access or drying. “Available quickly” does not mean “work completed quickly”.

If several companies are involved, plan who will coordinate their visits. A cheaper quote may leave you with more organisation to manage. The Homegrade brochure on preparing and monitoring building work presents the roles of those involved and the benefits of formally setting out how the work will proceed.

For payment, ask for the deposit amount, what it covers and the billing stages. Compare the amounts requested with specific orders and expected progress. A company requesting a large advance should be able to explain it; do not treat a percentage described as “standard” as a universal legal limit.

Choose a clear payment schedule with identifiable stages. Some contracts subject to specific regulations may include additional protections: for a major renovation with advance payments, have the applicable legal framework checked, including whether the Breyne Law applies.

The Embuild tips for preparing a renovation recommend examining advance payments and insurance, and checking the service provider’s bank account. If a message announces a change of IBAN, confirm it through an established contact before making any transfer.

9. Plan for additional charges and completion before signing

Ask how a change you request, a damaged substrate discovered after removal or an unavailable item will be handled. The contract should make clear who informs you, how the cost is calculated and how your agreement is obtained.

Good practice is to request a written amendment before any additional work: description, price or calculation method, VAT and impact on the schedule. Also make provision for urgent safety measures. Keep the versions of the quote and identify the one you accept.

For acceptance of the work, have it clarified how the work will be checked, how defects and outstanding issues will be recorded, and which documents will be provided: instructions, technical data sheets, certificates or inspection reports required for the project. Do not sign a document stating “without reservations” if defects still need to be reported.

Guarantees must be described with their actual scope. A “ten-year guarantee” does not automatically cover all finishes and equipment. FPS Economy explains the conditions for compulsory ten-year civil liability insurance for certain residential construction projects. Ask for insurance appropriate to the planned work and have important technical or legal points checked if necessary.

10. Use a simple decision checklist

Fill in the same checklist for each proposal. The assessments help structure your decision; they do not certify the company.

CriterionInformation to record from each quote
ScopeWork included, excluded and uncertain
Technical aspectsReferences, performance and substrate preparation
BudgetTotal including VAT for an equivalent scope and costs not yet priced
Price changesFixed price, quantities, time-and-materials billing, qualifications and price revision
OrganisationStart, duration, coordination and contact person
PaymentDeposit, stages, due dates and balance
Documented trustVerified identity, comparable references and relevant insurance
CompletionAcceptance, recorded defects and outstanding issues, and documents to be provided

First rule out quotes that leave an essential point unanswered. Between two comparable proposals, you can then weigh price, timing and quality. A long quote is not necessarily precise; look for verifiable answers.

You can find service providers to contact through OnLa.be, in the Businesses and services section, then send them the same specification. The presence of an advertisement does not remove the need to check the company, its references and its written quote.

A message requesting clarification

Hello, thank you for your quote. Before making my decision, could you clarify whether removal, waste disposal, substrate preparation and finishing work are included? Please also specify the material references, VAT rates for each item, proposed schedule and payment schedule. For provisional quantities and any additional charges, could you explain the calculation method and the prior approval procedure? I would like an updated version incorporating these details.

Adapt the questions to the information actually missing. Also ask for the general terms and conditions to be sent to you if they are not included in the document you received.

Frequently asked questions

Is a quote always free?

No. Fees may apply, particularly for a study, but they must be disclosed in advance. Also check whether these fees are deducted from the invoice if you place an order, without assuming that they will be.

Should I choose the cheapest quote?

A low price can be attractive when the scope, technical approach and terms meet your needs. If it relies on exclusions or unclear quantities, ask for the additional details before concluding that it offers good value.

Can a grant advertised by the company be deducted from the budget?

Distinguish between the amount payable and any potential financial assistance. Check the current conditions with the relevant regional body, particularly any steps to take before work begins. A sales estimate guarantees neither eligibility for nor payment of a grant. Keep a financing plan that allows you to pay invoices by their due dates.

Who can help me if I do not understand the technical differences?

Depending on the project, an architect or independent adviser can analyse the solutions. In Brussels, Homegrade supports individuals with their renovation projects. Also check the necessary permits with the municipality and any relevant co-ownership approvals before scheduling the work.

Before giving your final approval

  • The companies have priced the same requirements.
  • Exclusions and provisional items are identified.
  • The materials and quantities are clear.
  • The total including VAT and any different rates are explained.
  • The start date, duration and payments are specified.
  • Procedures for additional charges and acceptance of the work are in place.
  • You have kept the final version and its appendices.

A useful comparison turns price differences into concrete questions. Once you have these answers, you can choose a company based on a clearer budget and commitments everyone understands.